| Release the change | Approved production order, mold/material/recipe revisions, previous-run status, personnel, lifting route and required equipment | Change authorization and controlled setup pack | Production planning / setup lead |
| Control hazardous energy | Facility-specific shutdown, isolation, stored-energy and verification steps required for the actual task and jurisdiction | Authorized-person energy-control record | Site safety / authorized setup team |
| Remove and preserve the outgoing mold | Services disconnected under the approved sequence, mold halves secured, lifting points used, condition and open issues recorded | Outgoing mold condition and storage handoff | Setup / tooling |
| Inspect machine and interfaces | Platens, fixing system, locating/nozzle area, ejector, cores, services, guards and relevant connections are ready for the incoming mold | Machine/interface readiness check | Setup / maintenance |
| Install and connect the incoming mold | Mold identity, orientation, support/fixing, ejector, cores, hot runner, water, hydraulic/pneumatic/electrical services and robot clearances | Installed-mold and connection record | Setup / tooling / integration |
| Load the controlled setup | Machine, mold, robot, auxiliary and inspection recipes/settings match released revisions; substitutions and changes are recorded | Recipe/version and deviation record | Process / controls / quality |
| Perform permitted functional checks | Authorized dry or setup-mode checks cover mold motion, ejection, cores, guards/interlocks, robot/peripheral signals and fault response | Functional checklist under the approved procedure | Setup / process / safety |
| Start and release production | Material condition, thermal state, purge/startup plan, controlled first shots, process window, part inspection and monitoring handoff | First-off approval and production release | Process / quality / production |