G38
MOLD CIRCUITS / TCD / MACHINE INTERFACE

A mold-temperature interface is released circuit by circuit—not by a ‘TCD ready’ label.

Pair the controlled mold-circuit map with the identified temperature-control device, machine endpoint, physical and utility responsibilities, selected OPC 40082-1 scope and configuration-specific FAT/SAT evidence.

ANSWER FIRST

One label cannot close four different interface layers.

Release the physical circuit, external services, measurement and data relationship as separate evidence rows. Keep every unknown supplier implementation, compatible option and operating value open until the responsible parties provide project records.

Build the fixed thermal-interface brief
Release package
  • Controlled mold and circuit identities
  • Identified TCD, device zones and machine endpoint
  • Physical, utility, measurement and data ownership
  • Selected release, profiles, facets and exclusions
  • Configured FAT/SAT evidence and change triggers
INTENT / OWNERSHIP

Keep the thermal interface narrower than utilities, MES and the full cell.

Each row assigns one buyer decision and rejects the adjacent inference.

Decision ownership and adjacent scope to keep separate
DecisionOwnsKeep separate
Identified mold-temperature interfaceThe controlled mold-circuit map, temperature-control device and zone identities, machine/display endpoint, selected data scope, responsibility split and configuration-specific FAT/SAT evidence.This page publishes no hose or coupling selection, connection drawing, setpoint, flow, pressure, temperature, pump, alarm or operating instruction.
Cell utilities and installationSite supply points, utility quality, available capacity, connection ownership, isolation boundary, layout, drainage and installation evidence for the complete cell.A site water or power entry does not define the mold-circuit map, the selected temperature-control device or its machine/data relationship.
General machine-interface registerEvery physical, electrical, utility, functional, data, safety and access endpoint across the IMM, mold, robot, auxiliaries and site systems.The temperature-control route narrows one peripheral and its mold circuits. It does not replace the complete endpoint register.
Hot-runner controller interfaceMold heating zones, thermocouples, electrical demand, controller, plugs, valve-gate scope, hot-runner data exchange and acceptance evidence.A hot-runner temperature zone is not automatically a circulating mold-temperature-control circuit or an OPC 40082-1 TCD zone.
IMM-to-MES data contractThe identified machine/MES endpoints, EUROMAP 77 / OPC 40077 scope, job, cycle and dataset semantics, write boundary and reconciliation evidence.Peripheral process values appearing in a machine or MES record do not prove a TCD endpoint, zone mapping, writable function or physical circuit.
FAT/SAT programmeThe full configured-machine and installed-cell test plan, approved methods, conditions, witnesses, observations, deviations, retest and closure.This route identifies evidence rows to request. Qualified project parties still define the test and safe operating method.
RFQ / THERMAL-INTERFACE REGISTER

Twenty fixed fields expose circuit, endpoint and evidence gaps.

Complete every field for the identified project; keep assumptions visible.

Twenty mold-temperature-control RFQ fields and requested evidence
Register fieldRecord for the proposed interfaceEvidence to request
Project and thermal-interface boundaryMold-temperature-control purpose, included mold circuits, proposed equipment and integration work, site work, supplier work and every explicit exclusionApproved scope diagram and responsibility matrix naming mold, machine, TCD, manifold, integrator and site owners
Mold identity and controlled revisionExact mold, fixed and moving halves, insert or auxiliary thermal loads where relevant, drawing revision and responsible mold partyControlled mold record tied to the proposed project rather than a generic mold family or photograph
Mold-circuit identity and mappingBuyer-approved names for every included supply/return pair, mold half or zone, circuit relationship and current drawing statusControlled circuit diagram and cross-reference that can be reconciled at the mold, manifold and TCD
Temperature-control device identityProposed manufacturer, model/configuration, serial identity when assigned, software revision, device-zone identity and responsible supplierConfiguration-specific supplier record; a device class, catalogue family or interface title is insufficient
IMM and controller endpoint identityExact proposed machine/controller identity, installed software and option baseline, display or integration endpoint and ownerConfiguration record tied to the proposed machine without implying any NEW ORIENTAL IMM implementation
Heat-transfer medium and process basisBuyer-approved medium, process purpose, material compatibility questions, external cooling/heating relationship and assumptions requiring supplier reviewProject basis and supplier disposition; this checklist selects no medium or operating condition
TCD-to-manifold circuit relationshipWhich TCD/device zone feeds which manifold or distribution point and which mold circuits it serves, including shared or separate returnsConfiguration drawing with identities and revision, not an inferred one-to-one relationship
Physical connection responsibilityConnection endpoints, hose/coupling and distribution ownership, routing and access responsibilities, leak-containment boundary and exclusionsSupplier-approved interface schedule and installed identification; no connection dimension or assembly instruction is published here
External service and load boundarySite services required by the identified TCD/manifold package, supplied connection points, site connection points and declared dependenciesConfiguration-specific utility schedule carried into the separate installation checklist
Sensor and measurement-point mapWhich device or circuit supplies each required temperature, flow, pressure or status observation and where the measurement point belongsControlled instrument and signal map with responsible owner; a screen label alone is not a measurement definition
Value semantics, units and statusMeaning, unit family, source, actual/set/limit distinction, validity/status meaning and missing-value treatment for each required recordField dictionary and configured observations without prescribing a target, tolerance or sampling interval
Companion specification and releaseSelected EUROMAP 82.1 / OPC 40082-1 release, related OPC 40083 release, document status and any controlled project extensionDated applicability record distinguishing official scope, optional elements, vendor extensions and project assumptions
Profile and facet scopeBasic server scope and any proposed alarms or maintenance facets for the identified endpoint, with unsupported or excluded functionsConfiguration-specific support declaration and testable matrix; profile names are not an implementation or certification result
Data endpoint and ownership boundaryWhich identified endpoint provides or consumes the required TCD/device-zone information, who owns mapping and which path remains separateApproved endpoint and responsibility record without publishing a network design, address, port, credential or certificate plan
Read, write and method boundaryEvery proposed read, write or method family, its business purpose, initiating owner, receiving owner, prerequisite approval and exclusionAllowlisted functional matrix and configured observation; no universal node map, command order or operating sequence is supplied
Alarm, fault and responsibility boundaryRequired status or alarm meaning, source, display/record owner, acknowledgement responsibility and project response ownerApproved semantic matrix and observed configured behavior; this page sets no alarm value, reset method or safe response
FAT evidence packageWhich circuit identities, endpoint mappings, displayed/recorded values, proposed functions and open deviations must be observed at factory reviewApproved FAT references, dated observations and deviation ownership under the separate acceptance programme
SAT evidence packageWhich as-installed identities, site services, routing, circuit mapping, data path and handover records require site confirmationApproved SAT references tied to the installed cell without prescribing commissioning or operating steps
As-built handover and change controlFinal identities, drawings, software and specification releases, mappings, accepted deviations, owners and recheck triggersSigned handover index and later change log covering mold, TCD, manifold, hose/coupling, sensor, software or endpoint changes
Open assumptions and release decisionEvery unknown compatibility, capability, option, value, responsibility or evidence item, its owner, due record and current release statusControlled action register; unanswered items remain open instead of becoming supplier or performance claims
EVIDENCE RELEASE

Release the configured relationship—not the interface name.

Retain evidence for the exact circuits, endpoints and revisions.

Evidence gate, record to retain and publication boundary
Evidence gateRecord to retainBoundary
Identity and circuit gateExact mold, circuit, TCD/device zone, manifold, machine/controller and responsible-party identities with controlled revisions.A generic diagram, catalogue page or TCD class does not prove the proposed physical circuit or equipment configuration.
Physical and utility gateApproved endpoints, routing and connection ownership, external services, distribution relationship and as-installed identification.Qualified suppliers and site parties select and approve the hardware; this page supplies no dimensions, materials or connection instructions.
Measurement and semantics gateRequired values, sources, measurement points, units, state meanings and configured observations for each included circuit or device zone.A displayed number does not establish sensor location, accuracy, acceptable process range or product quality.
OPC UA scope gateSelected OPC 40082-1 and OPC 40083 releases, proposed profiles/facets, supported elements, controlled extensions and functional evidence.A namespace or companion-specification name does not prove endpoint support, interoperability, conformance or certification.
Acceptance gateProject-approved FAT/SAT references, observations, witnesses, deviations, retest and closure for the configured interface.The register names evidence to request; it is not a test procedure, risk assessment, commissioning plan or operating instruction.
Handover and change gateAs-built circuit and endpoint records, software/specification revisions, accepted deviations, owners and recheck triggers.A later mold, TCD, circuit, sensor, manifold, connection, software or interface change reopens the affected evidence rows.
PRIMARY SOURCES / BOUNDARY

Use current official scope records and named OEM examples without transferring a capability.

Reviewed 1 August 2026. EUROMAP and the OPC Foundation identify Release 1.01 for temperature-control-device data exchange; the OPC reference separates its basic, alarms and maintenance facets and excludes safety-related signals. ENGEL and HB-Therm sources are named-manufacturer examples only. None proves a NEW ORIENTAL IMM device, interface, compatibility, performance, conformity, certification or case.

EUROMAP

EUROMAP 82 — OPC UA for Peripheral Devices

The official series page identifies EUROMAP 82.1 for temperature-control devices and says the series standardizes data exchange from peripherals to production machines and higher-level systems. It lists Release 1.01 for part 82.1.

Boundary: The series page is a scope and release record. It does not prove that an identified machine, TCD or project endpoint implements or supports the specification.

OPC Foundation / EUROMAP

OPC 40082-1 Release 1.01 — Current Specification Record

The official reference lists Release 1.01, published 2020-06-01, as current for temperature-control-device data exchange and identifies the primary namespace model version.

Boundary: A release or namespace identity is not an endpoint implementation, interoperability, conformance, certification or supplier-capability record.

OPC Foundation / EUROMAP

OPC 40082-1 Full Scope and Information Model

The official scope covers general device information, status and process data and excludes safety-related signals such as emergency stop. The model distinguishes device zones, process values and optional elements.

Boundary: The published model does not prove that every optional element or method is present, writable, correctly mapped or fit for the identified project.

OPC Foundation / EUROMAP

OPC 40082-1 Profiles and Conformance Units

The official profile chapter separates the basic server profile from alarms and maintenance server facets.

Boundary: Profile and facet names require configuration-specific support and verification evidence. They are not interchangeable with certification or interoperability results.

ENGEL

Electronic Mould Temperature-Control Water-Manifold Monitoring

This named OEM example shows circuit-level monitoring, machine-display integration and retained records for an ENGEL eco-flomo configuration, illustrating why circuit identity, measurement source and record ownership belong in an RFQ.

Boundary: The functions, limits, integration and results belong only to the named ENGEL configuration. None transfers to NEW ORIENTAL IMM or establishes a universal design or performance claim.

HB-Therm

Gate-6 Interface Server

This named TCD-manufacturer example describes OPC UA communication and translation between EUROMAP 82.1 and listed proprietary protocols, showing why exact endpoint, protocol and ownership records are required.

Boundary: The HB-Therm functions apply only to the named products and configurations. They do not prove a machine-side option, compatibility, cybersecurity result or NEW ORIENTAL IMM capability.

BUYER QUESTIONS

Mold temperature-control interface FAQ

The answers separate physical circuits, utilities, data scope, supplier capability and configured evidence.

01Does ‘mold temperature controller ready’ prove that the machine, TCD and mold circuits are compatible?

No. Identify the exact mold circuits, TCD/device zones, machine endpoint, physical and utility responsibilities, selected interface release, proposed functions and configuration-specific FAT/SAT evidence.

02Does OPC 40082-1 define the hoses, couplings and mold water-circuit layout?

No. It is a temperature-control-device data-exchange model. Physical connections, circuit distribution, materials, routing and site services remain project-specific supplier and site responsibilities.

03Does OPC 40082-1 include emergency-stop or other safety-related signals?

No. Its official scope expressly excludes safety-related signals such as emergency stop. Keep the applicable machine, peripheral and site safety boundaries in the qualified project risk and validation work.

04Can a value shown on the machine screen prove mold-circuit performance?

No. Record the source device, measurement point, circuit or device-zone mapping, value meaning, unit, validity/status and configured acceptance evidence. A displayed value alone does not prove process suitability or part quality.

05Do the ENGEL or HB-Therm examples prove a NEW ORIENTAL IMM option?

No. They are named-manufacturer examples used only to expose procurement fields. Their devices, functions, limits, integration, results and interfaces do not transfer to NEW ORIENTAL IMM.

06What should the mold-temperature-control interface RFQ include?

Include the mold and circuit identities; TCD, device-zone, manifold and machine endpoint identities; medium and utility basis; connection ownership; sensor/value semantics; selected OPC 40082-1 scope; read/write boundary; fault ownership; FAT/SAT evidence; handover revisions; and open deviations.

RFQ / MOLD TEMPERATURE-CONTROL INTERFACE

Send the circuit identities, endpoint scope and evidence requirements.

Attach the controlled mold and circuit map; identified TCD/device zones, manifold and machine endpoint; medium and site-service basis; connection and measurement ownership; selected OPC 40082-1 and OPC 40083 releases; proposed profiles/facets and read/write boundary; fault responsibilities; FAT/SAT evidence; handover revisions; and open deviations. Keep every unconfirmed supplier implementation, compatibility, operating value, certification and result open.