| Exact machine and clamping-unit configuration | Machine identity, clamping-unit architecture, included configuration, relevant revisions and the physical unit presented for acceptance | Controlled identity/configuration record that prevents a family name or another machine from standing in for the tested unit |
|---|
| Controlled quotation/drawing revision | Quotation, specification, platen drawing, clamping-unit drawing and amendment revisions that define the purchased and inspected scope | Buyer-approved document index with superseded revisions retained and conflicts still visible |
|---|
| Decision purpose and acceptance stage | Buyer decision served, factory/site stage, release boundary and questions deliberately excluded | Approved acceptance matrix showing why the record is needed and which later decisions remain open |
|---|
| Selected method and edition | Named method, document number, year or edition, applicability decision, amendments and responsible method owner | Contract-controlled reference; the page supplies no default method and reproduces no protected procedure detail |
|---|
| Contractual scope and document precedence | Included parties, responsibilities, deliverables, exclusions, acceptance authority and precedence among purchase documents | Signed requirement matrix retaining unresolved conflicts rather than filling them from generic guidance |
|---|
| Machine and environmental preconditions | Required machine state, preparation, environment, stabilization basis, safety controls and limitation owners for the agreed test | Method- and machine-specific approved condition record; this page prescribes no setup value |
|---|
| Closing state/position basis | The agreed closing state or position reference, how it is identified and the boundary over which the reported result applies | Controlled method/test-state record; no position, load or closing condition is supplied by this page |
|---|
| Platen, mold or test-fixture state | Which platen surfaces, mold or fixture condition, installed components and preparation state apply to the observation | Released configuration record without assuming that an empty platen, installed mold or fixture state transfers to another state |
|---|
| Measurement principle | The physical measurement principle, reference relationship, interpretation and declared limitations | Configuration-specific technical statement from the responsible test party without a default instrument or principle |
|---|
| Datums and measurement locations | Every agreed datum, reference system, location identity, mapping and responsibility for installed or temporary equipment | Released drawing or method record; no universal point or geometric inference is supplied |
|---|
| Instrument identity and range | Instrument manufacturer/model/serial identity, configured range, unit, revision, connection and applicability declaration | Device-specific record from the responsible party; no instrument, range or accuracy is attributed to NEW ORIENTAL IMM |
|---|
| Calibration traceability | Calibration or verification record, date/status, traceability statement, applicability and limitation owner | Dated instrument-specific evidence; no interval, laboratory, method, accuracy or traceability claim is supplied here |
|---|
| Repetitions and raw readings | The contract-agreed observation count, sequence reference, unrounded raw entries, invalid observations and retained data location | Complete signed/raw record with exclusions explained; this page sets no repetition count or sequence |
|---|
| Reported result, expression and unit | The reported parallelism result, how it is expressed, original unit, calculation/rounding treatment and responsible reporter | Machine- and state-specific report clearly separated from nominal platen dimensions and drawing tolerances |
|---|
| Uncertainty or stated limitations | Declared measurement uncertainty where supplied, method/instrument limitations, excluded effects and interpretation boundary | Responsible-party statement; absence remains visible and no generic accuracy or repeatability is inferred |
|---|
| Criterion/tolerance and responsible approver | Contract source for the project-specific criterion, its expression/unit, approval status, exception authority and named role | Buyer/supplier-approved requirement; no allowable deviation, tolerance or pass/fail rule is supplied by this page |
|---|
| Witnesses, deviations, retest, final report disposition and change triggers | Required witnesses, observations, deviations, containment, retest decision, approvals, final report location and events requiring review | Signed disposition record that does not turn a partial observation, unsigned draft or changed machine state into acceptance |
|---|