CLAMPING FORCE / MACHINE ACCEPTANCE

Nominal tonnage is a claim to record—not proof of the exact machine’s measured maximum clamping force.

Build one configuration-specific acceptance record from machine identity and contractual method through the measurement chain, raw result, limitations, criterion, witnesses, deviations and final disposition.

ANSWER FIRST

Agree the sixteen evidence fields before treating a machine-side force value as accepted.

Keep nominal/rated force, controller setpoint and measured maximum force in separate rows. Name the exact machine and configuration, selected method and edition, conditions, measurement chain, raw record, limitations and contractual disposition.

Build the fixed maximum-force acceptance brief
Do not merge
  • Required mold/process demand and machine capability
  • Nominal label, setpoint and measured result
  • Maximum force and platen parallelism
  • Performance evidence and machine safety
  • One record and complete FAT/SAT release
Keep mold/process clamp demand separate
CAPABILITY BOUNDARY

This is a buyer acceptance register, not a tested-force, instrument, compliance or certification claim.

No NEW ORIENTAL IMM tested force, measurement instrument, accuracy, repeatability, tolerance, calibration, control function, EUROMAP 7 compliance, ISO 20430 compliance, certification, conformity or passed FAT/SAT result is claimed.

No fixed allowable deviation, force, test load, measurement position, correction, repetition count, safety margin, sequence, tolerance, default method, default instrument or pass/fail rule is supplied. Actual values and methods require project-controlled evidence and approval.

INTENT OWNERSHIP

Keep one maximum-force record separate from five adjacent decisions.

The same machine, platen, mold or FAT/SAT file may appear in several records, but each route answers a different procurement question.

Decision owner, owned scope and mandatory exclusion
Decision ownerOwnsMust stay separate
Maximum clamping-force acceptance recordOne exact machine and clamping-unit configuration, its claimed value, selected test basis, controlled conditions, measurement chain, raw record, reported result, limitations, contractual criterion and disposition.It does not prescribe a test procedure, prove a supplier result or release another machine, configuration, mold or production process.
Required mold/process clamp demandProjected area, approved cavity-pressure basis, pressure distribution, tool loads and a project-confirmed margin for the molding job.Calculated demand is not measured machine capability; a measured maximum-force record does not calculate the demand for a mold and process.
Toggle versus two-platen architectureClamp architecture, mold access, movement, footprint, maintenance and project-specific operating trade-offs.Architecture names do not prove a maximum force, measurement method, repeatability, platen behavior or machine suitability.
Mold mounting and platen interfacePlaten dimensions, tie-bar spacing, centering, mounting pattern, contact surfaces, mold load and the exact mechanical fit record.Maximum force does not prove mold fit, platen parallelism, force distribution, tie-bar balance or acceptable contact geometry.
Complete FAT and SAT programmeThe full approved machine/cell scope, conditions, instruments, observations, witnesses, deviations, retest and acceptance authority.This page supplies one evidence register, not a complete FAT/SAT plan, fixed challenge sequence, safety validation or production release.
Machine safety and conformity evidenceApplicable legal regime, risk assessment, safeguards, declarations, standards evidence, instructions and responsible economic-operator records.A maximum-force record and an ISO 20430 title do not prove safety, compliance, conformity, certification or CE documentation.
OFFICIAL SOURCE / SCOPE BOUNDARY

Keep EUROMAP 7, 9 and 10—and ISO 20430—in their own evidence rows.

Historical recommendations and the current ISO safety record may frame questions. Only the controlled project record releases a result for the exact machine and configuration.

Source, public status, permitted use and non-transfer boundary
SourcePublic statusMay informCannot release
EUROMAP technical-recommendations catalogueCurrent catalogue reviewed 1 August 2026; separately lists EUROMAP 7 (1995), EUROMAP 9 (1998) and EUROMAP 10 (1975)The exact document number, historical year, public title and which evidence question each recommendation addresses.An ISO status, legal requirement, certification, universal procedure, supplier capability, measured result or project acceptance.
EUROMAP 7 (1995)Official historical recommendation titled for determination of the maximum clamping force of injection moulding machinesThe candidate method-and-edition row for a buyer/supplier acceptance record when the parties agree its applicability.A fixed method, position, sequence, deviation, repetition count, correction, tolerance, pass/fail rule or NEW ORIENTAL IMM result.
EUROMAP 9 (1998)Official historical recommendation separately titled for testing platen parallelismA distinct adjacent evidence request where platen parallelism matters to the project.Maximum force, force distribution, tie-bar balance, mold fit, production quality or an interchangeable EUROMAP 7 method.
EUROMAP 10 (1975)Official historical general testing-and-acceptance recommendation for injection moulding machinesA contractual discussion about supplier/buyer test scope, acceptance stage and document disposition.A universally current procedure, a substitute for EUROMAP 7, a fixed acceptance rule or a completed FAT/SAT programme.
ISO 20430:2020Published injection-moulding-machine safety standard; current public ISO record confirmed in 2025Only the separate safety-scope and standards-evidence discussion for the exact machine and destination market.A maximum-clamping-force performance test, measured force, safety result, conformity, certification or supplier compliance.
Controlled project acceptance recordConfiguration-specific evidence agreed by the buyer, supplier and responsible test/acceptance partiesThe actual machine identity, selected method, conditions, measurement chain, raw data, reported result, limitations, criterion and disposition.Another machine or configuration, a universal tolerance, mold-fit result, production-quality result or unsupported supplier claim.
FIXED RFQ REGISTER / 16 FIELDS

Request the same sixteen evidence fields for every proposed machine.

Leave unknowns open. Do not fill them from a tonnage class, standard title, controller screen, machine-family statement or another project's record.

Maximum-force RFQ field, controlled record and evidence boundary
RFQ fieldRecordEvidence to request
Exact machine and clamping-unit configurationMachine identity, clamping-unit architecture, included configuration, relevant revisions and the physical unit presented for acceptanceControlled identity/configuration record that prevents a family name or another machine from standing in for the tested unit
Quotation revisionQuotation, specification and amendment revision that contains the claimed value and purchased scopeBuyer-approved document index with superseded revisions retained and discrepancies still visible
Nominal/rated value and unitThe exact label, value, unit, source document and whether it is nominal, rated, set, calculated or otherwise definedControlled supplier statement without treating a nameplate, tonnage class or controller entry as a measured result
Purpose and acceptance stageBuyer decision served, factory/site stage, release boundary and questions deliberately excludedApproved acceptance matrix showing why the record is needed and which later decisions remain open
Selected method and editionNamed method, document number, year or edition, applicability decision, amendments and responsible method ownerContract-controlled reference; the page supplies no default method and reproduces no protected procedure detail
Contractual scopeIncluded parties, responsibilities, deliverables, exclusions, acceptance authority and precedence among purchase documentsSigned scope/requirement matrix retaining unresolved conflicts rather than filling them from generic guidance
Machine/test preconditionsRequired machine state, configuration, environment, preparation, safety controls and limitation owners for the agreed testMethod- and machine-specific approved condition record; no precondition or setup is prescribed by this page
Measurement principleThe physical measurement principle, relationship to the clamping system, interpretation and declared limitationsConfiguration-specific technical statement from the responsible test party without a default instrument or principle
Measurement locationsEvery agreed location, channel relationship, reference system, mapping and responsibility for installed or temporary equipmentReleased drawing or method record; no universal location or force-distribution inference is supplied
Instrument identity and rangeInstrument manufacturer/model/serial identity, configured range, unit, revision, connection and applicability declarationDevice-specific record from the responsible party; no instrument, range or accuracy is attributed to NEW ORIENTAL IMM
Calibration traceabilityCalibration or verification record, date/status, traceability statement, applicability and limitation ownerDated instrument-specific evidence; no interval, laboratory, method, accuracy or traceability claim is supplied here
Repetitions and raw recordsThe contract-agreed observation count, sequence reference, unrounded raw entries, invalid runs and retained data locationComplete signed/raw record with exclusions explained; this page sets no repetition count or test sequence
Reported result and unitReported maximum-force result, original unit, calculation/rounding treatment, source record and responsible reporterConfiguration-specific report clearly separated from nominal/rated values and controller setpoints
Stated uncertainty or limitationsDeclared measurement uncertainty where supplied, method/instrument limitations, excluded effects and interpretation boundaryResponsible-party statement; absence remains visible and no generic accuracy or repeatability is inferred
Criterion/tolerance and responsible approverContract source for the project-specific criterion, its unit/basis, approval status, exception authority and named roleBuyer/supplier-approved requirement; no allowable deviation, safety margin, tolerance or pass/fail rule is supplied by this page
Witnesses, deviations, retest and final report dispositionRequired witnesses, observations, deviations, containment, retest decision, approvals, open actions and final controlled-report locationSigned disposition record that does not turn a partial observation or unsigned draft into machine acceptance
EVIDENCE RELEASE

Move from identity to final disposition without turning the register into a test procedure.

Buyer, supplier and responsible test/acceptance parties own the selected method, safe conditions, instruments, criteria and release.

01

Identity gate

One exact machine, clamping-unit configuration and controlled quotation/specification baseline.

A series name or nominal tonnage class cannot substitute for configuration identity.
02

Method and condition gate

The agreed method/edition, contractual applicability, preconditions, measurement principle, locations and instrument record.

A standard title alone does not prove that a method was selected, followed or applicable.
03

Result and limitation gate

Raw records, reported value/unit, declared uncertainty or limitations and traceable responsible parties.

Nominal/rated force and controller settings remain separate from a measured maximum-force result.
04

Disposition gate

Contractual criterion, approvals, witnesses, deviations, retest and final report disposition.

One accepted record does not prove platen parallelism, mold fit, safety, production quality or another machine.
PRIMARY SOURCES / BOUNDARY

Use official EUROMAP and ISO records without turning their titles into machine results.

Reviewed 1 August 2026. The EUROMAP catalogue keeps EUROMAP 7 (1995), EUROMAP 9 (1998) and EUROMAP 10 (1975) separate. ISO 20430:2020 is a published machine-safety standard whose current public record was confirmed in 2025; it is not the maximum-clamping-force test. None of these records proves a NEW ORIENTAL IMM result, compliance, certification, conformity or passed acceptance.

EUROMAP

Technical Recommendations catalogue

The catalogue reviewed 1 August 2026 separately lists EUROMAP 7 (1995) for maximum clamping force, EUROMAP 9 (1998) for platen parallelism and EUROMAP 10 (1975) for general testing and acceptance.

Boundary: Catalogue presence supplies public title and historical status only. It does not establish ISO status, legal force, certification, supplier capability, a universal procedure or a machine result.

EUROMAP

EUROMAP 7 (1995) — Determination of the maximum clamping force

The official historical recommendation is the directly named machine-side maximum-clamping-force source that buyer and supplier may select contractually.

Boundary: No protected procedure, fixed position, load, correction, repetition count, allowable deviation, tolerance, pass/fail rule or NEW ORIENTAL IMM result is reproduced or inferred.

EUROMAP

EUROMAP 9 (1998) — Testing of platen parallelism

The official historical recommendation identifies platen parallelism as a separate machine evidence question.

Boundary: It is not equivalent to EUROMAP 7 and does not prove maximum force, force distribution, tie-bar balance, mold fit or production quality.

EUROMAP

EUROMAP 10 (1975) — Testing and acceptance of machines

The official historical recommendation provides general supplier/buyer testing-and-acceptance context whose applicability must be agreed in the contract.

Boundary: It is not reproduced as a universal current procedure, a substitute for EUROMAP 7, a fixed acceptance criterion or a complete FAT/SAT programme.

ISO

ISO 20430:2020 — Injection moulding machines — Safety requirements

ISO's current public record identifies the published safety standard and records confirmation in 2025.

Boundary: Its scope is machine safety. It is not a maximum-clamping-force performance test and proves no measured force, supplier compliance, conformity, certification or acceptance result.

BUYER QUESTIONS

Injection molding machine maximum clamping-force acceptance FAQ

The answers keep machine demand, nominal values, measured performance, platen evidence, safety and supplier claims in separate controlled records.

01Does nominal tonnage prove the maximum clamping force of the exact machine?

No. Preserve the nominal/rated value as one sourced field, then separately agree the exact machine/configuration, method, conditions, measurement chain, raw record, reported result, limitations, contractual criterion and disposition. A controller setpoint is separate again.

02Does this page claim a NEW ORIENTAL IMM force result or test capability?

No. No tested force, instrument, accuracy, repeatability, tolerance, calibration, method implementation, compliance, certification or passed FAT/SAT result is attributed to NEW ORIENTAL IMM. Those fields remain open until controlled machine-specific evidence exists.

03Are EUROMAP 7 and EUROMAP 9 interchangeable?

No. The current catalogue names EUROMAP 7 (1995) for determination of maximum clamping force and EUROMAP 9 (1998) for platen parallelism. They own different evidence questions, and neither result can be inferred from the other.

04Does EUROMAP 10 supply the complete current FAT/SAT procedure?

No. EUROMAP 10 (1975) is retained as historical general supplier/buyer testing-and-acceptance context. Its age, applicability and contractual role must be agreed; this page does not reproduce it as a universal procedure.

05Does ISO 20430:2020 prove maximum clamping force or machine compliance?

No. ISO's public record identifies a machine-safety standard, not a maximum-clamping-force performance test. A title does not prove a measured result, implemented requirement, conformity, certification or acceptance.

06Which tolerance, instrument, measurement position or repetition count should be used?

This page supplies no default. The contract and responsible technical parties must identify the selected method/edition, applicable conditions, measurement principle and locations, instrument and calibration evidence, repetition/raw-record plan, criterion and approval authority.

07What belongs in the maximum clamping-force acceptance RFQ?

Request all sixteen fixed fields: machine/configuration; quotation revision; nominal/rated value; purpose/stage; method/edition; contract scope; preconditions; principle; locations; instrument/range; calibration; repetitions/raw records; result/unit; uncertainty/limitations; criterion/approver; and witnesses, deviations, retest and report disposition.

RFQ / MAXIMUM CLAMPING-FORCE ACCEPTANCE

Send the exact machine, claimed value and sixteen-field evidence requirement.

Attach the machine and clamping-unit configuration, quotation revision, nominal/rated value, purpose and stage, selected method and edition, contractual scope, preconditions, measurement principle and locations, instrument and calibration evidence, repetitions and raw records, reported result and unit, stated uncertainty or limitations, criterion and approver, witnesses, deviations, retest and final report disposition. Keep every unconfirmed value, method, instrument, tolerance, compliance statement and result open.