Compare injection molding machine quotes without erasing their original basis.

Record at least two configured offers, keep the raw specification beside the buyer-normalized entry, expose missing fields and attach every comparison to a document or trial boundary.

ANSWER FIRST

Normalize for traceability—not for an automatic winner.

Machine quotes often use different units, reference resins, configurations and scope boundaries. This local workspace separates the original entry, its declared basis, the buyer's normalized record and the evidence still needed before a purchasing decision.

Set the common machine-selection basis first
Comparison boundary
  • No prefilled supplier specifications
  • No automatic fit, pass/fail or ranking
  • Raw and normalized entries remain separate
  • Missing data is a completeness flag only
  • Documents and trials remain the verification gate
Define the acceptance evidence
LOCAL WORKSPACE / NO SUBMISSION

Normalize the record without hiding the source.

Enter the original quote wording first, then add its declared unit or basis, your normalized comparison entry and the file or trial that must verify it.

Browser-local session

This tool does not submit or upload entries. Entries normally remain only on this page and refreshing or closing it clears them. If you explicitly continue to the Project Fit Brief, only the six buyer-basis fields are held temporarily in this browser tab for the one-page handoff. Copy, download and print actions create records outside this tab that may remain in the system clipboard, Downloads folder, synced storage or a saved PDF; keep those copies in buyer-controlled storage.

01 / BUYER BASIS

Set the job that every quote must answer.

These are buyer inputs, not machine assumptions. Use the same controlled part, mold, resin, output and site basis across quotes.

02 / QUOTE SET

Keep at least two configured offers visible.

OPTION 01Required comparison column
OPTION 02Required comparison column
03 / COMPLETENESS

Count gaps without scoring suitability.

These counts show whether fields, normalization and evidence references were recorded. They are not a pass/fail result or supplier recommendation.

Quote A
Raw entries
0/12
Normalized
0/12
Evidence refs
0/12
Raw missing
12
Quote B
Raw entries
0/12
Normalized
0/12
Evidence refs
0/12
Raw missing
12
04 / FIELD MATRIX

Compare one meaning at a time.

On a narrow screen, each field keeps quote cards inside its own horizontal strip so the page itself remains readable.

01 / Scope / identity

Quoted machine and configured scope

Common comparison basis
Model, injection unit, screw, clamping unit, options, auxiliaries and quote revision.
File / trial boundary
Match the commercial offer to the controlled configuration list and drawings.
Quote ARaw value missing
Quote BRaw value missing
02 / Mold fit

Clamp, platen and tie-bar fit

Common comparison basis
Buyer-required clamp basis plus usable tie-bar spacing and platen area in one unit system.
File / trial boundary
Check the mold drawing, projected-area/pressure basis and configured machine drawing; do not infer fit from nominal tonnage alone.
Quote ARaw value missing
Quote BRaw value missing
03 / Mold fit

Mold thickness, daylight, opening and ejection

Common comparison basis
Minimum/maximum mold thickness, opening stroke, daylight, ejector stroke/force and core requirements.
File / trial boundary
Verify the installed mold stack, motion sequence and access using controlled drawings and an agreed trial.
Quote ARaw value missing
Quote BRaw value missing
04 / Mold fit / site

Mold weight, support and handling access

Common comparison basis
Installed mold mass, support condition, crane/fork access and changeover route.
File / trial boundary
Supplier drawings are inputs, not a lift plan, foundation design or safe-work procedure.
Quote ARaw value missing
Quote BRaw value missing
05 / Injection

Shot capacity and usable shot basis

Common comparison basis
Keep original mass/volume, reference resin or density, screw diameter, cushion and buyer shot demand visible.
File / trial boundary
A converted value is a comparison aid; confirm the configured injection unit with the actual resin, runner and mold trial.
Quote ARaw value missing
Quote BRaw value missing
06 / Injection

Injection speed, volume rate, pressure and fill evidence

Common comparison basis
Separate screw linear speed, volume flow, pressure definition, profile and measured fill time.
File / trial boundary
Catalogue maxima and conversions do not prove simultaneous performance or acceptable part quality.
Quote ARaw value missing
Quote BRaw value missing
07 / Plasticizing

Plasticizing capacity and recovery window

Common comparison basis
Rate, reference resin/test condition, screw, shot demand, cooling window and residence constraint.
File / trial boundary
Normalize the declared test basis, then verify recovery and melt quality with the project resin and cycle.
Quote ARaw value missing
Quote BRaw value missing
08 / Energy / boundary

Energy method, included loads and denominator

Common comparison basis
Name machine-related, product-related or complete-cell method; record configuration, loads, exclusions and denominator.
File / trial boundary
Matching units do not create a matching boundary. Use comparable files or an agreed metered trial before costing.
Quote ARaw value missing
Quote BRaw value missing
09 / Interfaces / safety

Robot, peripheral, data and safety interfaces

Common comparison basis
Endpoints, connector/media, exact specification/version, signals/nodes, safety path, options and fault behavior.
File / trial boundary
Verify both configured endpoints and the separate safety validation at FAT/SAT; a 'ready' label is not evidence.
Quote ARaw value missing
Quote BRaw value missing
10 / Utilities / auxiliaries

Power, cooling, air and auxiliary scope

Common comparison basis
Voltage/phase/frequency, connected and operating demand, water conditions, air, oil and included auxiliaries.
File / trial boundary
Reconcile supplier utility schedules with the final cell, site capacity and installed configuration.
Quote ARaw value missing
Quote BRaw value missing
11 / Service / handover

Spares, files, training and support handover

Common comparison basis
Critical parts, drawings, software/backups, manuals, training, warranty, response route and exclusions.
File / trial boundary
Record contractual scope and named evidence; do not infer stock, response time or geographic coverage.
Quote ARaw value missing
Quote BRaw value missing
12 / Trial / documents

Trial configuration and acceptance evidence

Common comparison basis
Machine/mold/resin configuration, stable condition, sample plan, output/quality record, deviations and closure owner.
File / trial boundary
The comparison record supports review only; final fit depends on approved documents and agreed trial evidence.
Quote ARaw value missing
Quote BRaw value missing
05 / LOCAL HANDOFF

Keep the comparison with the controlled files.

CSV preserves one row per field and quote. The text record keeps the buyer basis, raw wording, normalization and verification boundary together.

Continue only the buyer basis

This explicit action keeps the six Buyer Basis fields in this tab's session storage for up to 30 minutes, then opens the Project Fit Brief. The RFQ removes the handoff as soon as it reads it. Quote columns, supplier wording, evidence references and filenames are never included, and nothing is uploaded.

Preview the supplier clarification brief
INJECTION MOLDING MACHINE — SUPPLIER CLARIFICATION BRIEF

This browser-local brief lists only supplier-facing gaps recorded in the current comparison table: raw supplier entry, source unit / declared basis, and document / trial reference.
Buyer-normalized entries are intentionally excluded. Normalization is a buyer-owned comparison input, not a supplier clarification request.
A missing item is a completeness prompt only; it does not determine machine fit, compliance or supplier qualification.

=== Quote A ===
Buyer record reference: [not recorded by buyer]

[Scope / identity] Quoted machine and configured scope
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit] Clamp, platen and tie-bar fit
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit] Mold thickness, daylight, opening and ejection
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit / site] Mold weight, support and handling access
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Injection] Shot capacity and usable shot basis
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Injection] Injection speed, volume rate, pressure and fill evidence
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Plasticizing] Plasticizing capacity and recovery window
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Energy / boundary] Energy method, included loads and denominator
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Service / handover] Spares, files, training and support handover
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Trial / documents] Trial configuration and acceptance evidence
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.


=== Quote B ===
Buyer record reference: [not recorded by buyer]

[Scope / identity] Quoted machine and configured scope
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit] Clamp, platen and tie-bar fit
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit] Mold thickness, daylight, opening and ejection
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Mold fit / site] Mold weight, support and handling access
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Injection] Shot capacity and usable shot basis
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Injection] Injection speed, volume rate, pressure and fill evidence
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Plasticizing] Plasticizing capacity and recovery window
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Energy / boundary] Energy method, included loads and denominator
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Service / handover] Spares, files, training and support handover
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.

[Trial / documents] Trial configuration and acceptance evidence
- Please provide the raw supplier entry (original quoted value or wording).
- Please state the source unit / declared basis.
- Please identify the controlled document or agreed trial reference.
Preview the browser-local text record
INJECTION MOLDING MACHINE — MULTI-QUOTE SPECIFICATION RECORD

This record compares completeness and stated bases. It does not rank suppliers, determine machine fit or replace controlled files and trials.
Entries were prepared in the browser and are not submitted by this tool.

BUYER PROJECT BASIS
Part / application: [not recorded]
Resin / grade: [not recorded]
Buyer output target: [not recorded]
Mold file basis: [not recorded]
Destination / site basis: [not recorded]
Planned verification: [not recorded]

=== Quote A ===
Quote / file reference: [not recorded]

[Scope / identity] Quoted machine and configured scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Model, injection unit, screw, clamping unit, options, auxiliaries and quote revision.
Verification boundary: Match the commercial offer to the controlled configuration list and drawings.

[Mold fit] Clamp, platen and tie-bar fit
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Buyer-required clamp basis plus usable tie-bar spacing and platen area in one unit system.
Verification boundary: Check the mold drawing, projected-area/pressure basis and configured machine drawing; do not infer fit from nominal tonnage alone.

[Mold fit] Mold thickness, daylight, opening and ejection
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Minimum/maximum mold thickness, opening stroke, daylight, ejector stroke/force and core requirements.
Verification boundary: Verify the installed mold stack, motion sequence and access using controlled drawings and an agreed trial.

[Mold fit / site] Mold weight, support and handling access
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Installed mold mass, support condition, crane/fork access and changeover route.
Verification boundary: Supplier drawings are inputs, not a lift plan, foundation design or safe-work procedure.

[Injection] Shot capacity and usable shot basis
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Keep original mass/volume, reference resin or density, screw diameter, cushion and buyer shot demand visible.
Verification boundary: A converted value is a comparison aid; confirm the configured injection unit with the actual resin, runner and mold trial.

[Injection] Injection speed, volume rate, pressure and fill evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Separate screw linear speed, volume flow, pressure definition, profile and measured fill time.
Verification boundary: Catalogue maxima and conversions do not prove simultaneous performance or acceptable part quality.

[Plasticizing] Plasticizing capacity and recovery window
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Rate, reference resin/test condition, screw, shot demand, cooling window and residence constraint.
Verification boundary: Normalize the declared test basis, then verify recovery and melt quality with the project resin and cycle.

[Energy / boundary] Energy method, included loads and denominator
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Name machine-related, product-related or complete-cell method; record configuration, loads, exclusions and denominator.
Verification boundary: Matching units do not create a matching boundary. Use comparable files or an agreed metered trial before costing.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Endpoints, connector/media, exact specification/version, signals/nodes, safety path, options and fault behavior.
Verification boundary: Verify both configured endpoints and the separate safety validation at FAT/SAT; a 'ready' label is not evidence.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Voltage/phase/frequency, connected and operating demand, water conditions, air, oil and included auxiliaries.
Verification boundary: Reconcile supplier utility schedules with the final cell, site capacity and installed configuration.

[Service / handover] Spares, files, training and support handover
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Critical parts, drawings, software/backups, manuals, training, warranty, response route and exclusions.
Verification boundary: Record contractual scope and named evidence; do not infer stock, response time or geographic coverage.

[Trial / documents] Trial configuration and acceptance evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Machine/mold/resin configuration, stable condition, sample plan, output/quality record, deviations and closure owner.
Verification boundary: The comparison record supports review only; final fit depends on approved documents and agreed trial evidence.

=== Quote B ===
Quote / file reference: [not recorded]

[Scope / identity] Quoted machine and configured scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Model, injection unit, screw, clamping unit, options, auxiliaries and quote revision.
Verification boundary: Match the commercial offer to the controlled configuration list and drawings.

[Mold fit] Clamp, platen and tie-bar fit
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Buyer-required clamp basis plus usable tie-bar spacing and platen area in one unit system.
Verification boundary: Check the mold drawing, projected-area/pressure basis and configured machine drawing; do not infer fit from nominal tonnage alone.

[Mold fit] Mold thickness, daylight, opening and ejection
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Minimum/maximum mold thickness, opening stroke, daylight, ejector stroke/force and core requirements.
Verification boundary: Verify the installed mold stack, motion sequence and access using controlled drawings and an agreed trial.

[Mold fit / site] Mold weight, support and handling access
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Installed mold mass, support condition, crane/fork access and changeover route.
Verification boundary: Supplier drawings are inputs, not a lift plan, foundation design or safe-work procedure.

[Injection] Shot capacity and usable shot basis
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Keep original mass/volume, reference resin or density, screw diameter, cushion and buyer shot demand visible.
Verification boundary: A converted value is a comparison aid; confirm the configured injection unit with the actual resin, runner and mold trial.

[Injection] Injection speed, volume rate, pressure and fill evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Separate screw linear speed, volume flow, pressure definition, profile and measured fill time.
Verification boundary: Catalogue maxima and conversions do not prove simultaneous performance or acceptable part quality.

[Plasticizing] Plasticizing capacity and recovery window
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Rate, reference resin/test condition, screw, shot demand, cooling window and residence constraint.
Verification boundary: Normalize the declared test basis, then verify recovery and melt quality with the project resin and cycle.

[Energy / boundary] Energy method, included loads and denominator
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Name machine-related, product-related or complete-cell method; record configuration, loads, exclusions and denominator.
Verification boundary: Matching units do not create a matching boundary. Use comparable files or an agreed metered trial before costing.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Endpoints, connector/media, exact specification/version, signals/nodes, safety path, options and fault behavior.
Verification boundary: Verify both configured endpoints and the separate safety validation at FAT/SAT; a 'ready' label is not evidence.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Voltage/phase/frequency, connected and operating demand, water conditions, air, oil and included auxiliaries.
Verification boundary: Reconcile supplier utility schedules with the final cell, site capacity and installed configuration.

[Service / handover] Spares, files, training and support handover
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Critical parts, drawings, software/backups, manuals, training, warranty, response route and exclusions.
Verification boundary: Record contractual scope and named evidence; do not infer stock, response time or geographic coverage.

[Trial / documents] Trial configuration and acceptance evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Machine/mold/resin configuration, stable condition, sample plan, output/quality record, deviations and closure owner.
Verification boundary: The comparison record supports review only; final fit depends on approved documents and agreed trial evidence.

Browser-local text record

INJECTION MOLDING MACHINE — MULTI-QUOTE SPECIFICATION RECORD

This record compares completeness and stated bases. It does not rank suppliers, determine machine fit or replace controlled files and trials.
Entries were prepared in the browser and are not submitted by this tool.

BUYER PROJECT BASIS
Part / application: [not recorded]
Resin / grade: [not recorded]
Buyer output target: [not recorded]
Mold file basis: [not recorded]
Destination / site basis: [not recorded]
Planned verification: [not recorded]

=== Quote A ===
Quote / file reference: [not recorded]

[Scope / identity] Quoted machine and configured scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Model, injection unit, screw, clamping unit, options, auxiliaries and quote revision.
Verification boundary: Match the commercial offer to the controlled configuration list and drawings.

[Mold fit] Clamp, platen and tie-bar fit
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Buyer-required clamp basis plus usable tie-bar spacing and platen area in one unit system.
Verification boundary: Check the mold drawing, projected-area/pressure basis and configured machine drawing; do not infer fit from nominal tonnage alone.

[Mold fit] Mold thickness, daylight, opening and ejection
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Minimum/maximum mold thickness, opening stroke, daylight, ejector stroke/force and core requirements.
Verification boundary: Verify the installed mold stack, motion sequence and access using controlled drawings and an agreed trial.

[Mold fit / site] Mold weight, support and handling access
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Installed mold mass, support condition, crane/fork access and changeover route.
Verification boundary: Supplier drawings are inputs, not a lift plan, foundation design or safe-work procedure.

[Injection] Shot capacity and usable shot basis
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Keep original mass/volume, reference resin or density, screw diameter, cushion and buyer shot demand visible.
Verification boundary: A converted value is a comparison aid; confirm the configured injection unit with the actual resin, runner and mold trial.

[Injection] Injection speed, volume rate, pressure and fill evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Separate screw linear speed, volume flow, pressure definition, profile and measured fill time.
Verification boundary: Catalogue maxima and conversions do not prove simultaneous performance or acceptable part quality.

[Plasticizing] Plasticizing capacity and recovery window
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Rate, reference resin/test condition, screw, shot demand, cooling window and residence constraint.
Verification boundary: Normalize the declared test basis, then verify recovery and melt quality with the project resin and cycle.

[Energy / boundary] Energy method, included loads and denominator
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Name machine-related, product-related or complete-cell method; record configuration, loads, exclusions and denominator.
Verification boundary: Matching units do not create a matching boundary. Use comparable files or an agreed metered trial before costing.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Endpoints, connector/media, exact specification/version, signals/nodes, safety path, options and fault behavior.
Verification boundary: Verify both configured endpoints and the separate safety validation at FAT/SAT; a 'ready' label is not evidence.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Voltage/phase/frequency, connected and operating demand, water conditions, air, oil and included auxiliaries.
Verification boundary: Reconcile supplier utility schedules with the final cell, site capacity and installed configuration.

[Service / handover] Spares, files, training and support handover
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Critical parts, drawings, software/backups, manuals, training, warranty, response route and exclusions.
Verification boundary: Record contractual scope and named evidence; do not infer stock, response time or geographic coverage.

[Trial / documents] Trial configuration and acceptance evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Machine/mold/resin configuration, stable condition, sample plan, output/quality record, deviations and closure owner.
Verification boundary: The comparison record supports review only; final fit depends on approved documents and agreed trial evidence.

=== Quote B ===
Quote / file reference: [not recorded]

[Scope / identity] Quoted machine and configured scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Model, injection unit, screw, clamping unit, options, auxiliaries and quote revision.
Verification boundary: Match the commercial offer to the controlled configuration list and drawings.

[Mold fit] Clamp, platen and tie-bar fit
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Buyer-required clamp basis plus usable tie-bar spacing and platen area in one unit system.
Verification boundary: Check the mold drawing, projected-area/pressure basis and configured machine drawing; do not infer fit from nominal tonnage alone.

[Mold fit] Mold thickness, daylight, opening and ejection
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Minimum/maximum mold thickness, opening stroke, daylight, ejector stroke/force and core requirements.
Verification boundary: Verify the installed mold stack, motion sequence and access using controlled drawings and an agreed trial.

[Mold fit / site] Mold weight, support and handling access
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Installed mold mass, support condition, crane/fork access and changeover route.
Verification boundary: Supplier drawings are inputs, not a lift plan, foundation design or safe-work procedure.

[Injection] Shot capacity and usable shot basis
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Keep original mass/volume, reference resin or density, screw diameter, cushion and buyer shot demand visible.
Verification boundary: A converted value is a comparison aid; confirm the configured injection unit with the actual resin, runner and mold trial.

[Injection] Injection speed, volume rate, pressure and fill evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Separate screw linear speed, volume flow, pressure definition, profile and measured fill time.
Verification boundary: Catalogue maxima and conversions do not prove simultaneous performance or acceptable part quality.

[Plasticizing] Plasticizing capacity and recovery window
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Rate, reference resin/test condition, screw, shot demand, cooling window and residence constraint.
Verification boundary: Normalize the declared test basis, then verify recovery and melt quality with the project resin and cycle.

[Energy / boundary] Energy method, included loads and denominator
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Name machine-related, product-related or complete-cell method; record configuration, loads, exclusions and denominator.
Verification boundary: Matching units do not create a matching boundary. Use comparable files or an agreed metered trial before costing.

[Interfaces / safety] Robot, peripheral, data and safety interfaces
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Endpoints, connector/media, exact specification/version, signals/nodes, safety path, options and fault behavior.
Verification boundary: Verify both configured endpoints and the separate safety validation at FAT/SAT; a 'ready' label is not evidence.

[Utilities / auxiliaries] Power, cooling, air and auxiliary scope
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Voltage/phase/frequency, connected and operating demand, water conditions, air, oil and included auxiliaries.
Verification boundary: Reconcile supplier utility schedules with the final cell, site capacity and installed configuration.

[Service / handover] Spares, files, training and support handover
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Critical parts, drawings, software/backups, manuals, training, warranty, response route and exclusions.
Verification boundary: Record contractual scope and named evidence; do not infer stock, response time or geographic coverage.

[Trial / documents] Trial configuration and acceptance evidence
Raw supplier entry: [missing]
Source unit / basis: [missing]
Buyer-normalized entry: [pending]
Document / trial reference: [missing]
Completeness note: Raw value missing
Comparison basis: Machine/mold/resin configuration, stable condition, sample plan, output/quality record, deviations and closure owner.
Verification boundary: The comparison record supports review only; final fit depends on approved documents and agreed trial evidence.

BUYER QUESTIONS

Specification comparison tool FAQ

These answers keep local data handling, normalization and purchasing judgment on separate boundaries.

01Does this tool recommend an injection molding machine or supplier?

No. It records completeness, definitions and evidence references. It does not score, rank, qualify or recommend a machine or supplier.

02Does a normalized specification prove machine fit?

No. A normalized entry only makes unlike wording or units easier to review. Confirm the configured machine, mold, resin, process, cell and destination requirements with controlled files and agreed trial evidence.

03Why keep the raw value beside the normalized value?

The raw entry preserves traceability to the quotation or datasheet. The normalized entry records the buyer's common comparison basis without silently replacing the supplier's original definition.

04What does a missing-item note mean?

It means a raw value, source basis, normalized entry or verification reference has not been recorded in this browser session. It is a completeness prompt, not a pass/fail judgment.

05Where does the comparison data go?

The quote columns remain only on the current browser page and are never included in the RFQ handoff. If you explicitly continue, only the six Buyer Basis fields are held in this tab's session storage for up to 30 minutes and deleted as soon as the Project Fit Brief reads them. Nothing is submitted or uploaded.

COMPARISON / NEXT STEP

Carry the open evidence items into one machine brief.

Export the comparison record, attach the controlled quote and drawing revisions, and convert unresolved fields into supplier questions or agreed FAT/SAT checks.